M/s. L & T HYDROCARBON ENGINEERING LIMITED

DESCRIPTION OF WORK REFICATORY MODULES AND SCAFFOLDING ERECTION FOR ROGC CONVECTION MODULES PROJECT JAMNAGAR AT L&THEL HAZIRA SURAT GUJARAT.

VALUE OF CONTRACT 110 Lacs

COMPLECTION TIME AS IN TENDER MONTHS. 4 Months

ACTUAL Oct - 14

YEAR OF COMPLETION 2014 - 15

M/s.HINDUSTAN PETROLEUM CORPORATION LIMITED

DESCRIPTION OF WORK SUPPLY AND APPLICATION INSULATION WORK FOR HOT EQUIPMENT,TOWER AND PIPING INSULATION FOR LR & FR Refinery SUTDOWN & MENTANANCE WORK

VALUE OF CONTRACT 160 Lacs

COMPLECTION TIME AS IN TENDER MONTHS. 9 Months

ACTUAL Oct - 14

YEAR OF COMPLETION 2014 - 15

M/S BASF INDIA LIMITED

DESCRIPTION OF WORK SUPPLY AND APPLICATION INSULATION WORK FOR HOT AND COLD EQUIPMENT AND PIPING INSULATION FOR DAHEJ GIDC PROJECT, A/C BASF LIMTED ,BHARUCH ,GUJARAT.

VALUE OF CONTRACT 10 Lacs

COMPLECTION TIME AS IN TENDER MONTHS. 3 Months

ACTUAL Sep - 14

YEAR OF COMPLETION 2014 - 15

M/s. SRF LIMITED

DESCRIPTION OF WORK SUPPLY AND APPLICATION INSULATION WORK FOR HOT AND COLD EQUIPMENT AND PIPING FOR HF AND HFC Project

VALUE OF CONTRACT 295 Lacs

COMPLECTION TIME AS IN TENDER MONTHS. 6 Months

ACTUAL April - 14

YEAR OF COMPLETION 2014 - 15

M/s. SRF LIMITED

DESCRIPTION OF WORK SUPPLY AND APPLICATION INSULATION WORK FOR HOT AND COLD EQUIPMENT AND PIPING INSULATION FOR P-2 Project

VALUE OF CONTRACT 119 Lacs

COMPLECTION TIME AS IN TENDER MONTHS. 7 Months

ACTUAL Aug - 14

YEAR OF COMPLETION 2014 - 15

M/s. HEURTEY PETROCHEM INDIA PVT.LIMITED

DESCRIPTION OF WORK SUPPLY AND APPLICATION INSULATION WORK FOR HOT AND ACOUSTIC EQUIPMENT AND PIPING INSULATION FOR RIL COKER FEED HEATER-RIL JAMNAGAR,GUJARAT

VALUE OF CONTRACT 25 Lacs

COMPLECTION TIME AS IN TENDER MONTHS. 5 Months

ACTUAL Apr - 14

YEAR OF COMPLETION 2014 - 15

M/s. CHEMITHON ENGINEERING PVT.LIMITED

DESCRIPTION OF WORK APPLICATION INSULATION WORK OF HOT & COLD INSULATION FOR EQUIPMENT'S AND PIPING,BASF CHEMICAL PLANT DAHEJ,BHARUCH ,GUJARAT

VALUE OF CONTRACT 1 Lacs

COMPLECTION TIME AS IN TENDER MONTHS. 1 Months

ACTUAL Aug - 14

YEAR OF COMPLETION 2014 - 15

M/s. HEURTEY PETROCHEM INDIA PVT.LIMITED

DESCRIPTION OF WORK SUPPLY AND APPLICATION INSULATION WORK FOR HOT AND ACOUSTIC EQUIPMENT AND PIPING INSULATION FOR RIL DAHEJ EDC CRACER PROJECT,DAHEJ,GUJARAT

VALUE OF CONTRACT 4 Lacs

COMPLECTION TIME AS IN TENDER MONTHS. 2 Months

ACTUAL July - 14

YEAR OF COMPLETION 2014 - 15

M/s. LARSEN &TOUBRO LIMITED

DESCRIPTION OF WORK APPLICATION INSULATION WORK FOR HOT & COLD EQUIPMENT'S AND PIPING ONGC APU (Additional Process Unit) URAN PLANT MUMBAI

VALUE OF CONTRACT 175 Lacs

COMPLECTION TIME AS IN TENDER MONTHS. 23 Months

ACTUAL June - 14

YEAR OF COMPLETION 2014 - 15

M/S OFFSHORE INFRASTRUCTURES LIMITED

DESCRIPTION OF WORK APPLICATION INSULATION WORK FOR HOT & COLD PIPING INSULATION FOR DHT OFFSITE PIPING Project.

VALUE OF CONTRACT 79 Lacs

COMPLECTION TIME AS IN TENDER MONTHS. 7 Months

ACTUAL May - 14

YEAR OF COMPLETION 2014 - 15

M/s. L & T HYDROCARBON ENGINEERING LIMITED

DESCRIPTION OF WORK SUPPLY AND APPLICATION INSULATION WORK FOR HOT & COLD EQUIPMENT'S AND PIPING B127 Project of ONGC

VALUE OF CONTRACT 133 Lacs

COMPLECTION TIME AS IN TENDER MONTHS. 6 Months

ACTUAL Mar - 14

YEAR OF COMPLETION 2014 - 15

M/s. LARSEN & TOUBRO LIMITED

DESCRIPTION OF WORK APPLICATION INSULATION WORK FOR HOT & COLD EQUIPMENT'S AND PIPING AND SCAFFOLDING ERECTION GNFC AMONIA SYN. GAS GENERATION PLANT BHARUCH GUJARAT

VALUE OF CONTRACT 16 Lacs

COMPLECTION TIME AS IN TENDER MONTHS. 2 Months

ACTUAL May - 14

YEAR OF COMPLETION 2014 - 15

M/s. LARSEN & TOUBRO LIMITED

DESCRIPTION OF WORK APPLICATION INSULATION WORK FOR HOT & COLD EQUIPMENT'S AND PIPING CCRC UNIT FOR 1.8KM & LSTK-1/3 AT OMPL-MARC,MANGALORE.

VALUE OF CONTRACT 45 Lacs

COMPLECTION TIME AS IN TENDER MONTHS. 4 Months

ACTUAL Apr - 14

YEAR OF COMPLETION 2014 - 15

M/s.THERMON HEAT TRACERS PVT.LTD

DESCRIPTION OF WORK APPLICATION INSULATION WORK FOR IE PIPING AT M/s. L & T HYDROCARBON ENGINEERING LIMITED,MFF- E & C Division,Hazira Manufacturing Complex,Post: Bhata 394

VALUE OF CONTRACT 1 Lacs

COMPLECTION TIME AS IN TENDER MONTHS. 1 Months

ACTUAL Mar - 14

YEAR OF COMPLETION 2013 - 14

M/s. L & T HYDROCARBON ENGINEERING LIMITED

DESCRIPTION OF WORK SUPPLY AND APPLICATION INSULATION WORK FOR HOT & COLD EQUIPMENT'S AND PIPING HRP II Project of ONGC

VALUE OF CONTRACT 83 Lacs

COMPLECTION TIME AS IN TENDER MONTHS. 5 Months

ACTUAL Feb - 14

YEAR OF COMPLETION 2013 - 14

M/s.HINDUSTAN PETROLEUM CORPORATION LIMITED

DESCRIPTION OF WORK SUPPLY AND APPLICATION INSULATION WORK FOR HOT EQUIPMENT,TOWER AND PIPING INSULATION FOR FR Refinery SUTDOWN & MENTANANCE WORK

VALUE OF CONTRACT 107 Lacs

COMPLECTION TIME AS IN TENDER MONTHS. 12 Months

ACTUAL Sep - 13

YEAR OF COMPLETION 2013 - 14

M/s. SRF LIMITED

DESCRIPTION OF WORK SUPPLY AND APPLICATION INSULATION WORK FOR HOT AND COLD EQUIPMENT AND PIPING INSULATION FOR P-11,POWER PLANT,UTILITY,HFC MENTANANCE WORK

VALUE OF CONTRACT 50 Lacs

COMPLECTION TIME AS IN TENDER MONTHS. 10 Months

ACTUAL Sep - 13

YEAR OF COMPLETION 2013 - 14

M/s.HINDUSTAN PETROLEUM CORPORATION LIMITED

DESCRIPTION OF WORK SUPPLY AND APPLICATION INSULATION WORK FOR HOT EQUIPMENT,TOWER AND PIPING INSULATION FOR LR Refinery WORK

VALUE OF CONTRACT 150 Lacs

COMPLECTION TIME AS IN TENDER MONTHS. 12 Months

ACTUAL Aug - 13

YEAR OF COMPLETION 2013 - 14

M/s. PROCESS CONSTRUCTION & TECHNICAL SERVICES PVT.LTD.

DESCRIPTION OF WORK SUPPLY AND APPLICATION INSULATION WORK FOR HOT AND COLD PIPING INSULATION FOR ONGC OFFSHORE

VALUE OF CONTRACT 8 Lacs

COMPLECTION TIME AS IN TENDER MONTHS. 2 Months

ACTUAL May - 13

YEAR OF COMPLETION 2013 - 14

M/s. LARSEN & TOUBRO LIMITED

DESCRIPTION OF WORK APPLICATION INSULATION WORK OF HOT & COLD INSULATION FOR EQUIPMENT'S AND PIPING OF ADDITIONAL GAS PROCESSING FACILITY PROJECT,LARSEN & TOUBRO LTD ONGC HAZIRA PROJECT,SURAT,GUJARAT.

VALUE OF CONTRACT 82 Lacs

COMPLECTION TIME AS IN TENDER MONTHS. 11 Months

ACTUAL Feb - 13

YEAR OF COMPLETION 2012 - 13

M/s. SRF LIMITED

DESCRIPTION OF WORK SUPPLY AND APPLICATION INSULATION WORK FOR HOT AND COLD EQUIPMENT AND PIPING INSULATION FOR P-11 & FMP PROJECT.

VALUE OF CONTRACT 253 Lacs

COMPLECTION TIME AS IN TENDER MONTHS. 13 Months

ACTUAL Jan - 13

YEAR OF COMPLETION 2012 - 13

M/s. LARSEN & TOUBRO LIMITED

DESCRIPTION OF WORK SUPPLY AND APPLICATION INSULATION WORK OF ACOUSTIC AND HOT & COLD INSULATION FOR EQUIPMENT'S AND PIPING OF DECK FOR GSPC PROJECT,L & T HAZIRA SURAT GUJARAT.

VALUE OF CONTRACT 98 Lacs

COMPLECTION TIME AS IN TENDER MONTHS. 6 Months

ACTUAL Dec - 12

YEAR OF COMPLETION 2012 - 13

M/s. LARSEN & TOUBRO LTD

DESCRIPTION OF WORK SUPPLY AND APPLICATION INSULATION WORK FOR HOT & COLD EQUIPMENT'S AND PIPING HYDROGEN GENERATION UNIT,MRPL-PHASE 3,PROJECT,MANGALORE.

VALUE OF CONTRACT 93 Lacs

COMPLECTION TIME AS IN TENDER MONTHS. 7 Months

ACTUAL Dec - 12

YEAR OF COMPLETION 2012 - 13

M/s.FIRMENICH AROMARICS PEODUCTION (India)Pvt. LIMITED

DESCRIPTION OF WORK SUPPLY AND APPLICATION INSULATION WORK FOR HOT & COLD EQUIPMENT'S AND PIPING

VALUE OF CONTRACT 6 Lacs

COMPLECTION TIME AS IN TENDER MONTHS. 4 Months

ACTUAL Dec - 12

YEAR OF COMPLETION 2012 - 13

M/s. LARSEN & TOUBRO LTD

DESCRIPTION OF WORK SUPPLY AND APPLICATION INSULATION WORK FOR HOT & COLD AND ACOUSTIC BRIDGE PIPING INSULATION FOR ,MHN ONGC PROJECT.

VALUE OF CONTRACT 5 Lacs

COMPLECTION TIME AS IN TENDER MONTHS. 4 Months

ACTUAL Dec - 12

YEAR OF COMPLETION 2012 - 13

M/s.SKAPS INDUSTRIES INDIA PVT.LTD

DESCRIPTION OF WORK SUPPLY AND APPLICATION OF HOT & COLD INSULATION WORK FOR EQUIPMENT'S ,DUCT AND PIPING,SKAPS INDUSTRIES INDIA PVT LTD-MUNDRA SEZ UNIT-II

VALUE OF CONTRACT 37 Lacs

COMPLECTION TIME AS IN TENDER MONTHS. 6 Months

ACTUAL Nov - 12

YEAR OF COMPLETION 2012 - 13

M/s.TEXSA INDIA LTD

DESCRIPTION OF WORK SUPPLY AND APPLICATION INSULATION WORK FOR HOT & COLD EQUIPMENT'S AND PIPING PROJECT.

VALUE OF CONTRACT 29 Lacs

COMPLECTION TIME AS IN TENDER MONTHS. 5 Months

ACTUAL Nov - 12

YEAR OF COMPLETION 2012 - 13

M/s. PROCESS CONSTRUCTION & TECHNICAL SERVICES PVT.LTD.

DESCRIPTION OF WORK APPLICATION INSULATION WORK FOR OF GSPC PROJECT-LQBM,TGBM & WSBM MODULE,DUCTM INSULATION,CHILD WATER PUIPING AT M/s. LARSEN & TOUBRO LINITED,MFF- E & C Division,Hazira Manufacturing Complex,Post: Bhata 394 ,Dist: Surat, Gujarat. India

VALUE OF CONTRACT 62 Lacs

COMPLECTION TIME AS IN TENDER MONTHS. 9 Months

ACTUAL Nov - 12

YEAR OF COMPLETION 2012 - 13

M/s. PROCESS CONSTRUCTION & TECHNICAL SERVICES PVT.LTD.

DESCRIPTION OF WORK APPLICATION INSULATION WORK FOR OF GSPC PROJECT-LQBM,TGBM & WSBM MODULE,DUCTM INSULATION,CHILD WATER PUIPING AT M/s. LARSEN & TOUBRO LINITED,MFF- E & C Division,Hazira Manufacturing Complex,Post: Bhata 394 ,Dist: Surat, Gujarat. India

VALUE OF CONTRACT 62 Lacs

COMPLECTION TIME AS IN TENDER MONTHS. 9 Months

ACTUAL Nov - 12

YEAR OF COMPLETION 2012 - 13

M/s.INDCON PROJECT & EQUIPMENT LINITED

DESCRIPTION OF WORK SUPPLY AND APPLICATION INSULATION WORK OF HOT INSULATION FOR EQUIPMENT'S AND PIPING OF GSPC PROJECT,L & T HAZIRA SURAT GUJARAT.

VALUE OF CONTRACT 1 Lacs

COMPLECTION TIME AS IN TENDER MONTHS. 9 Months

ACTUAL Nov - 12

YEAR OF COMPLETION 2012 - 13

M/s. LARSEN & TOUBRO LIMITED

DESCRIPTION OF WORK ACOUSTIC INSULATION WORK FOR FD AND ID FAN,AMMONIA SYNGAS GENERATION PLANT,L&T LTD. GNFC,BHARUCH,GUJARAT.

VALUE OF CONTRACT 9 Lacs

COMPLECTION TIME AS IN TENDER MONTHS. 2 Months

ACTUAL Aug - 12

YEAR OF COMPLETION 2012 - 13

M/s.SPAN ERECTORS PRIVATE LIMITED

DESCRIPTION OF WORK SUPPLY AND APPLICATION INSULATION WORK FOR HOT & COLD EQUIPMENT'S AND PIPING ,CLINT ROXUL ROCKWOOL INSULATION PVT.LTD. SEZ,DAHEJ,PROJECT,BHARUCH,GUJARAT.

VALUE OF CONTRACT 45 Lacs

COMPLECTION TIME AS IN TENDER MONTHS. 7 Months

ACTUAL Mar - 12

YEAR OF COMPLETION 2011 - 12

M/s. LARSEN & TOUBRO LINITED

DESCRIPTION OF WORK SUPPLY AND APPLICATION INSULATION WORK OF ACOUSTIC AND HOT & COLD INSULATION FOR EQUIPMENT'S AND PIPING OF DECK FOR MHN-PPLQ PROJECT,L & T HAZIRA SURAT GUJARAT.

VALUE OF CONTRACT 300 Lacs

COMPLECTION TIME AS IN TENDER MONTHS. 5 Months

ACTUAL Feb - 12

YEAR OF COMPLETION 2011 - 12

M/s. PROCESS CONSTRUCTION & TECHNICAL SERVICES PVT.LTD.

DESCRIPTION OF WORK APPLICATION INSULATION WORK FOR OF MHN-LQ/GTG PROJECT MODULE,DUCT INSULATION,CHILD WATER PUIPING AT M/s. LARSEN & TOUBRO LINITED,MFF- E & C Division,Hazira Manufacturing Complex,Post: Bhata 394 ,Dist: Surat, Gujarat. India

VALUE OF CONTRACT 126 Lacs

COMPLECTION TIME AS IN TENDER MONTHS. 5 Months

ACTUAL Feb - 12

YEAR OF COMPLETION 2011 - 12

M/s. GUJARAT STATE ENERGY GENERATION LIMITED

DESCRIPTION OF WORK SUPPLY AND APPLICATION INSULATION WORK OF HOT & COLD INSULATION FOR EQUIPMENT'S AND PIPING OF GT-12 DD O/L EXP BELLOW REPLACE

VALUE OF CONTRACT 3 Lacs

COMPLECTION TIME AS IN TENDER MONTHS. 2 Months

ACTUAL Feb - 12

YEAR OF COMPLETION 2011 - 12

M/s.PERFFCT FABRICATORS & CONT.CO

DESCRIPTION OF WORK APPLICATION INSULATION WORK OF HOT & COLD INSULATION FOR EQUIPMENT'S,PIPING AT HPCL MAHUL REFINERY MUMBAI.

VALUE OF CONTRACT 5 Lacs

COMPLECTION TIME AS IN TENDER MONTHS. 3 Months

ACTUAL Jan - 12

YEAR OF COMPLETION 2011 - 12

M/s.TOYO ENGINEERING INDIA LIMITED

DESCRIPTION OF WORK APPLICATION INSULATION WORK OF HOT & COLD INSULATION FOR EQUIPMENT'S AND PIPING OF DHT Project,HPCL MUMBAI REFINERY,B.D. PATIL MARG. MAHUL MUMBAI-400 074.

VALUE OF CONTRACT 7 Lacs

COMPLECTION TIME AS IN TENDER MONTHS. 4 Months

ACTUAL Nov - 11

YEAR OF COMPLETION 2011 - 12

M/s. LARSEN & TOUBRO LIMITED

DESCRIPTION OF WORK SUPPLY AND APPLICATION INSULATION WORK OF HOT & COLD INSULATION FOR EQUIPMENT'S,PIPING & DUCTING FOR PGC,ONGC PROJECT,L & T HAZIRA SURAT GUJARAT.

VALUE OF CONTRACT 50 Lacs

COMPLECTION TIME AS IN TENDER MONTHS. 2 Months

ACTUAL Nov - 11

YEAR OF COMPLETION 2011 - 12

M/s. LARSEN & TOUBRO LIMITED

DESCRIPTION OF WORK SUPPLY AND APPLICATION INSULATION WORK OF HOT & COLD INSULATION FOR EQUIPMENT'S,PIPING & DUCTING FOR MHNRD,ONGC PROJECT,L & T HAZIRA SURAT GUJARAT.

VALUE OF CONTRACT 50 Lacs

COMPLECTION TIME AS IN TENDER MONTHS. 3 Months

ACTUAL Aug - 11

YEAR OF COMPLETION 2011 - 12

M/s. LARSEN & TOUBRO LIMITED

DESCRIPTION OF WORK SUPPLY AND APPLICATION INSULATION WORK OF HOT & COLD INSULATION FOR EQUIPMENT'S,PIPING & DUCTING FOR MHNRD,ONGC PROJECT,L & T HAZIRA SURAT GUJARAT.

VALUE OF CONTRACT 50 Lacs

COMPLECTION TIME AS IN TENDER MONTHS. 3 Months

ACTUAL Aug - 11

YEAR OF COMPLETION 2011 - 12

M/s.HINDUSTAN PETROLEUM CORPORATION LIMITED

DESCRIPTION OF WORK SUPPLY AND APPLICATION INSULATION WORK FOR HOT EQUIPMENT,TOWER AND PIPING INSULATION FOR LR & FR Refinery SUTDOWN & MENTANANCE WORK

VALUE OF CONTRACT 2 Lacs

COMPLECTION TIME AS IN TENDER MONTHS. 2 Months

ACTUAL Apr - 11

YEAR OF COMPLETION 2011 - 12

M/s. GUJARAT STATE ENERGY GENERATION LIMITED

DESCRIPTION OF WORK SUPPLY AND APPLICATION INSULATION WORK OF HOT & COLD INSULATION FOR EQUIPMENT'S AND PIPING OF GT-12 DD O/L EXP BELLOW REPLACE

VALUE OF CONTRACT 5 Lacs

COMPLECTION TIME AS IN TENDER MONTHS. 2 Months

ACTUAL Apr - 11

YEAR OF COMPLETION 2011 - 12

M/S OFFSHORE INFRASTRUCTURES LIMITED

DESCRIPTION OF WORK SUPPLY AND APPLICATION INSULATION WORK FOR HOT PIPING INSULATION AT HPCL MAHUL REFINERY MUMBAI.

VALUE OF CONTRACT 3 Lacs

COMPLECTION TIME AS IN TENDER MONTHS. 2 Months

ACTUAL Feb - 11

YEAR OF COMPLETION 2010 - 11

M/s. GUJARAT STATE ENERGY GENERATION LIMITED

DESCRIPTION OF WORK SUPPLY AND APPLICATION INSULATION WORK OF HOT & COLD INSULATION FOR EQUIPMENT'S AND PIPING OF GT-12 DD O/L EXP BELLOW REPLACE

VALUE OF CONTRACT 10 Lacs

COMPLECTION TIME AS IN TENDER MONTHS. 2 Months

ACTUAL Feb - 11

YEAR OF COMPLETION 2010 - 11

M/s.RAGMET ENGINEERING (P) LIMITED

DESCRIPTION OF WORK APPLICATION INSULATION WORK FOR HOT PIPING INSULATION AND FIRE PROOFING AT HPCL MAHUL REFINERY MUMBAI.

VALUE OF CONTRACT 2 Lacs

COMPLECTION TIME AS IN TENDER MONTHS. 2 Months

ACTUAL Feb - 11

YEAR OF COMPLETION 2010 - 11

M/S OFFSHORE INFRASTRUCTURES LIMITED

DESCRIPTION OF WORK SUPPLY AND APPLICATION INSULATION WORK FOR HOT PIPING INSULATION AT HPCL MAHUL REFINERY MUMBAI.

VALUE OF CONTRACT 15 Lacs

COMPLECTION TIME AS IN TENDER MONTHS. 3 Months

ACTUAL Dec - 10

YEAR OF COMPLETION 2010 - 11

M/s. J. K. CONSTRUCTION CO.ENGINEERS & CONTRACTORS

DESCRIPTION OF WORK SUPPLY AND APPLICATION INSULATION WORK FOR HOT PIPING INSULATION AT HPCL MAHUL REFINERY MUMBAI.

VALUE OF CONTRACT 5 Lacs

COMPLECTION TIME AS IN TENDER MONTHS. 3 Months

ACTUAL Dec - 10

YEAR OF COMPLETION 2010 - 11

M/s. LARSEN & TOUBRO LIMITED

DESCRIPTION OF WORK APPLICATION INSULATION WORK FOR HOT PIPING INSULATION AT HPCL MAHUL REFINERY MUMBAI.

VALUE OF CONTRACT 4 Lacs

COMPLECTION TIME AS IN TENDER MONTHS. 2 Months

ACTUAL Dec - 10

YEAR OF COMPLETION 2010 - 11

M/s.UB ENGINEERING LIMITED

DESCRIPTION OF WORK APPLICATION INSULATION WORK OF HOT & COLD INSULATION FOR EQUIPMENT'S,PIPING ATWPCL 4X135MW POWER PLANT PROJECT, MIDC, WARORA, CHANDRAPUR, MAHARASHTRA.

VALUE OF CONTRACT 75 Lacs

COMPLECTION TIME AS IN TENDER MONTHS. 6 Months

ACTUAL Nov - 10

YEAR OF COMPLETION 2010 - 11

M/s.SUGEN MEGA POWER PROJECT

DESCRIPTION OF WORK APPLICATION INSULATION WORK OF HOT & COLD INSULATION FOR EQUIPMENT'S,PIPING ATWPCL 4X135MW POWER PLANT PROJECT, MIDC, WARORA, CHANDRAPUR, MAHARASHTRA.

VALUE OF CONTRACT 75 Lacs

COMPLECTION TIME AS IN TENDER MONTHS. 6 Months

ACTUAL Nov - 10

YEAR OF COMPLETION 2010 - 11

M/s.SUGEN MEGA POWER PROJECT,TORANT POWER LIMITED

DESCRIPTION OF WORK SUPPLY AND APPLICATION INSULATION WORK OF HOT & COLD INSULATION FOR EQUIPMENT'S,PIPING HVAC DUCTING FOR TORANT POWER LIMITED.

VALUE OF CONTRACT 2 Lacs

COMPLECTION TIME AS IN TENDER MONTHS. 2 Months

ACTUAL Nov - 10

YEAR OF COMPLETION 2010 - 11

M/s.BLUE STAR LIMITED

DESCRIPTION OF WORK SUPPLY AND APPLICATION INSULATION WORK OF HOT & COLD INSULATION FOR EQUIPMENT'S,PIPING GMS CONSTRUCTIONS PVT.LTD.SANTACRUZ (E) MUMBAI-400-098

VALUE OF CONTRACT 1 Lacs

COMPLECTION TIME AS IN TENDER MONTHS. 1 Months

ACTUAL Nov - 10

YEAR OF COMPLETION 2010 - 11

M/s.ELMATICS ENGINEERS PVT.LTD

DESCRIPTION OF WORK APPLICATION INSULATION WORK FOR HOT PIPING INSULATION AND FIRE PROOFING AT HPCL MAHUL REFINERY MUMBAI.

VALUE OF CONTRACT 5 Lacs

COMPLECTION TIME AS IN TENDER MONTHS. 3 Months

ACTUAL Oct - 10

YEAR OF COMPLETION 2010 - 11

M/s. LARSEN & TOUBRO LIMITED

DESCRIPTION OF WORK SUPPLY AND APPLICATION INSULATION WORK OF HOT & COLD INSULATION FOR EQUIPMENT'S,PIPING &HVAC DUCTING FOR MAERSK OIL QATAR PROJECT,L & T HAZIRA SURAT GUJARAT.

VALUE OF CONTRACT 20 Lacs

COMPLECTION TIME AS IN TENDER MONTHS. 9 Months

ACTUAL Dec - 09

YEAR OF COMPLETION 2010 - 11

M/s. PROCESS CONSTRUCTION & TECHNICAL SERVICES PVT.LTD

DESCRIPTION OF WORK APPLICATION INSULATION WORK FOR OF MOQ QATAR PROJECT MODULE,DUCT INSULATION,CHILD WATER PUIPING AT M/s. LARSEN & TOUBRO LINITED,MFF- E & C Division,Hazira Manufacturing Complex,Post: Bhata 394 ,Dist: Surat, Gujarat. India

VALUE OF CONTRACT 36 Lacs

COMPLECTION TIME AS IN TENDER MONTHS. 5 Months

ACTUAL Nov - 09

YEAR OF COMPLETION 2009 - 10

M/s.FABZ FABRICOM (India)PVT.LTD

DESCRIPTION OF WORK APPLICATION INSULATION WORK FOR OFBCP-B2 PROJECT UNDERDECK INSULATION,MODULE,DUCT INSULATION,CHILD WATER PUIPING AT M/s. LARSEN & TOUBRO LINITED,MFF- E & C Division,Hazira Manufacturing Complex,Post: Bhata 394 ,Dist: Surat, Gujarat. India

VALUE OF CONTRACT 25 Lacs

COMPLECTION TIME AS IN TENDER MONTHS. 23 Months

ACTUAL Jan - 09

YEAR OF COMPLETION 2008 - 09

M/s. GUJARAT STATE ENERGY GENERATION LIMITED

DESCRIPTION OF WORK SUPPLY AND APPLICATION INSULATION WORK OF HOT & COLD INSULATION FOR EQUIPMENT'S AND PIPING OF GT-12 DD O/L EXP BELLOW REPLACE

VALUE OF CONTRACT 5 Lacs

COMPLECTION TIME AS IN TENDER MONTHS. 1 Months

ACTUAL Apr - 08

YEAR OF COMPLETION 2008 - 09

M/s.FABZ FABRICOM (India)PVT.LTD.

DESCRIPTION OF WORK APPLICATION INSULATION WORK FOR 4-WELL PLATEFORM PROJECT UNDERDECK INSULATION,MODULE,DUCT INSULATION,CHILD WATER PUIPING AT M/s. LARSEN & TOUBRO LINITED,MFF- E & C Division,Hazira Manufacturing Complex,Post: Bhata 394 ,Dist: Surat, Gujarat. India

VALUE OF CONTRACT 20 Lacs

COMPLECTION TIME AS IN TENDER MONTHS. 7 Months

ACTUAL Mar - 07

YEAR OF COMPLETION 2006 - 07

M/s.NIKO RESOURCES LIMITED

DESCRIPTION OF WORK SUPPLY AND APPLICATION INSULATION WORK OF HOT & COLD INSULATION FOR EQUIPMENT'S AND PIPING OF HAZIRA GAS FACILITY

VALUE OF CONTRACT 10 Lacs

COMPLECTION TIME AS IN TENDER MONTHS. 4 Months

ACTUAL Mar - 07

YEAR OF COMPLETION 2006 - 07

M/s.ESSAR CONSTRUCTIONS LIMITED

DESCRIPTION OF WORK SUPPLY AND APPLICATION INSULATION WORK OF HOT INSULATION FOR EQUIPMENT'S AND PIPING OF 500mw POWER PROJECT HAZIRA,SURAT GJ.

VALUE OF CONTRACT 50 Lacs

COMPLECTION TIME AS IN TENDER MONTHS. 6 Months

ACTUAL Dec - 06

YEAR OF COMPLETION 2006 - 07

M/s.NIKO RESOURCES LIMITED

DESCRIPTION OF WORK SUPPLY AND APPLICATION INSULATION WORK OF HOT & COLD INSULATION FOR EQUIPMENT'S AND PIPING OF GLYCOL REGENERATION SYATEM,HAZIRA GAS FACILITY

VALUE OF CONTRACT 10 Lacs

COMPLECTION TIME AS IN TENDER MONTHS. 4 Months

ACTUAL Jul - 06

YEAR OF COMPLETION 2006 - 07

M/s.NIKO RESOURCES LIMITED

DESCRIPTION OF WORK SUPPLY AND APPLICATION INSULATION WORK OF HOT & COLD INSULATION FOR EQUIPMENT'S AND PIPING OF GLYCOL REGENERATION SYATEM,HAZIRA GAS FACILITY

VALUE OF CONTRACT 1 Lacs

COMPLECTION TIME AS IN TENDER MONTHS. 1 Months

ACTUAL Jun - 06

YEAR OF COMPLETION 2006 - 07

M/s.NIKO RESOURCES LIMITED

DESCRIPTION OF WORK SUPPLY AND APPLICATION INSULATION WORK OF HOT & COLD INSULATION FOR EQUIPMENT'S AND PIPING OF GLYCOL REGENERATION SYATEM,HAZIRA GAS FACILITY

VALUE OF CONTRACT 1 Lacs

COMPLECTION TIME AS IN TENDER MONTHS. 1 Months

ACTUAL Jun - 06

YEAR OF COMPLETION 2006 - 07

M/s.ESSAR CONSTRUCTIONS LIMITED

DESCRIPTION OF WORK SUPPLY AND APPLICATION INSULATION WORK OF HOT INSULATION FOR EQUIPMENT'S AND PIPING OF 500mw POWER PROJECT HAZIRA,SURAT GJ.

VALUE OF CONTRACT 10 Lacs

COMPLECTION TIME AS IN TENDER MONTHS. 2 Months

ACTUAL Jun - 05

YEAR OF COMPLETION 2005 - 06

M/s.TITANIUM EQUIPMENT AND ANODE MANUFACTURING COMPANY LIMITED

DESCRIPTION OF WORK SUPPLY & APPLICATION INSULATION WORK FOR HOT PIPING INSULATION AT HPCL MAHUL REFINERY MUMBAI.

VALUE OF CONTRACT 1 Lacs

COMPLECTION TIME AS IN TENDER MONTHS. 1 Months

ACTUAL May - 05

YEAR OF COMPLETION 2005 - 06

M/s.TITANIUM EQUIPMENT AND ANODE MANUFACTURING COMPANY LIMITED

DESCRIPTION OF WORK SUPPLY & APPLICATION INSULATION WORK FOR HOT PIPING INSULATION AT HPCL MAHUL REFINERY MUMBAI.

VALUE OF CONTRACT 1 Lacs

COMPLECTION TIME AS IN TENDER MONTHS. 1 Months

ACTUAL May - 05

YEAR OF COMPLETION 2005 - 06

M/s.HORIZON OFFSHORE SERVICES (I) PVT.LIMITED

DESCRIPTION OF WORK APPLICATION INSULATION WORK FOR 9WELL PLATEFORM PHASE-I PROJECT UNDERDECK INSULATION,MODULE,DUCT INSULATION,CHILD WATER PUIPING AT M/s. LARSEN & TOUBRO LINITED,MFF- E & C Division,Hazira Manufacturing Complex,Post: Bhata 394 ,Dist: Surat, Gujarat. India

VALUE OF CONTRACT 20 Lacs

COMPLECTION TIME AS IN TENDER MONTHS. 6 Months

ACTUAL Mar - 05

YEAR OF COMPLETION 2004 - 05

M/s. LARSEN & TOUBRO LImITED

DESCRIPTION OF WORK SUPPLY AND APPLICATION INSULATION WORK OF HOT & COLD INSULATION FOR EQUIPMENT'S,PIPING & DUCTING FOR QATAR PETROLEUM-LQ/GTG PROJECT,L & T HAZIRA SURAT GUJARAT.

VALUE OF CONTRACT 20 Lacs

COMPLECTION TIME AS IN TENDER MONTHS. 2 Months

ACTUAL Jan - 05

YEAR OF COMPLETION 2004 - 05

M/s.MOOSA HAJI PATRAWALA PVT.LIMITED

DESCRIPTION OF WORK APPLICATION INSULATION WORK FOR QATAR PETROLEUM PLATEFORM PROJECT UNDERDECK INSULATION,MODULE,DUCT INSULATION,CHILD WATER PUIPING AT M/s. LARSEN & TOUBRO LINITED,MFF- E & C Division,Hazira Manufacturing Complex,Post: Bhata 394 ,Dist: Surat, Gujarat. India

VALUE OF CONTRACT 10 Lacs

COMPLECTION TIME AS IN TENDER MONTHS. 3 Months

ACTUAL Nov - 04

YEAR OF COMPLETION 2004 - 05

M/s.MOOSA HAJI PATRAWALA PVT.LIMITED

DESCRIPTION OF WORK APPLICATION INSULATION WORK FOR QATAR PETROLEUM PLATEFORM PROJECT UNDERDECK INSULATION,MODULE,DUCT INSULATION,CHILD WATER PUIPING AT M/s. LARSEN & TOUBRO LINITED,MFF- E & C Division,Hazira Manufacturing Complex,Post: Bhata 394 ,Dist: Surat, Gujarat. India

VALUE OF CONTRACT 10 Lacs

COMPLECTION TIME AS IN TENDER MONTHS. 3 Months

ACTUAL Nov - 04

YEAR OF COMPLETION 2004 - 05

M/s.HORIZON OFFSHORE SERVICES (I) PVT.LIMITED

DESCRIPTION OF WORK APPLICATION INSULATION WORK FOR PS-2Q AND 3Q QATAR PETROLEUM PLATEFORM PROJECT UNDERDECK INSULATION,MODULE,DUCT INSULATION,CHILD WATER PUIPING AT M/s. LARSEN & TOUBRO LINITED,MFF- E & C Division,Hazira Manufacturing Complex,Post: Bhata 394 ,Dist: Surat, Gujarat. India

VALUE OF CONTRACT 25 Lacs

COMPLECTION TIME AS IN TENDER MONTHS. 6 Months

ACTUAL Oct - 04

YEAR OF COMPLETION 2004 - 05

M/s.HORIZON OFFSHORE SERVICES (I) PVT.LIMITED

DESCRIPTION OF WORK APPLICATION INSULATION WORK FOR MNW PROJECT UNDERDECK INSULATION,MODULE,DUCT INSULATION,CHILD WATER PUIPING AT M/s. LARSEN & TOUBRO LINITED,MFF- E & C Division,Hazira Manufacturing Complex,Post: Bhata 394 ,Dist: Surat, Gujarat. India

VALUE OF CONTRACT 20 Lacs

COMPLECTION TIME AS IN TENDER MONTHS. 6 Months

ACTUAL Apr - 04

YEAR OF COMPLETION 2004 - 05

M/s.THERMAX SERVICE FRANCHISEE

DESCRIPTION OF WORK SUPPLY AND APPLICATION INSULATION WORK OF HOT INSULATION FOR EQUIPMENT'S AND PIPING OF vapour absorption chiller at zenith silk mills ltd.surat.

VALUE OF CONTRACT 14 Lacs

COMPLECTION TIME AS IN TENDER MONTHS. 3 Months

ACTUAL Apr - 04

YEAR OF COMPLETION 2004 - 05

M/s.HORIZON OFFSHORE SERVICES (I) PVT.LIMITED

DESCRIPTION OF WORK APPLICATION INSULATION WORK FOR9WPP PLATEFORM PROJECT UNDERDECK INSULATION,MODULE,DUCT INSULATION,CHILD WATER PUIPING AT M/s. LARSEN & TOUBRO LINITED,MFF- E & C Division,Hazira Manufacturing Complex,Post: Bhata 394 ,Dist: Surat, Gujarat. India

VALUE OF CONTRACT 14 Lacs

COMPLECTION TIME AS IN TENDER MONTHS. 3 Months

ACTUAL Feb - 04

YEAR OF COMPLETION 2003 - 04

Jobs In Hand

M/s. SRF LIMITED

DESCRIPTION OF WORK SUPPLY AND APPLICATION INSULATION WORK FOR HOT AND COLD EQUIPMENT AND PIPING

VALUE OF CONTRACT 75 Lacs

COMPLECTION TIME AS IN TENDER MONTHS. 12 Months

ACTUALApril - 14

EXPECTED DATE OF COMPLETION March - 15

M/s.HINDUSTAN PETROLEUM CORPORATION LIMITED

DESCRIPTION OF WORK SUPPLY AND APPLICATION INSULATION WORK FOR HOT EQUIPMENT,TOWER, TANKS AND PIPING INSULATION FOR LR & FR Refinery WORK

VALUE OF CONTRACT 275 Lacs

COMPLECTION TIME AS IN TENDER MONTHS. 12 Months

ACTUALOct - 14

EXPECTED DATE OF COMPLETION Oct - 15

M/S BASF INDIA LIMITED

DESCRIPTION OF WORK SUPPLY AND APPLICATION INSULATION WORK FOR HOT AND COLD EQUIPMENT AND PIPING INSULATION FOR DAHEJ GIDC PROJECT, A/C BASF LIMTED ,BHARUCH ,GUJARAT.

VALUE OF CONTRACT 40 Lacs

COMPLECTION TIME AS IN TENDER MONTHS. 12 Months

ACTUALSept - 14

EXPECTED DATE OF COMPLETION Sept - 15

M/S OFFSHORE INFRASTRUCTURES LIMITED

DESCRIPTION OF WORK SUPPLY AND APPLICATION INSULATION WORK FOR HOT AND COLD EQUIPMENT AND PIPING INSULATION HDPE / LLDPE SWING UNIT AT GAIL INDIA LTD. GAILPATA, U.P.

VALUE OF CONTRACT 112 Lacs

COMPLECTION TIME AS IN TENDER MONTHS. 27 Months

ACTUALDec - 12

EXPECTED DATE OF COMPLETION Dec - 14

Contact

Address : 106, Silver Point, Nr. Galaxy Circle, PAL Village, Adajan, Surat-395 009 Gujarat - India

Mob. NO.: +91 09825108320 / 09879508320

Copyright © 2015 l RK Insulation Engineers. All rights reserved.
Designed & Developed Creative Saints